Residential hydronic floor heating renovation

Queens Park, New South Wales

Project in progress

This renovation in Queens Park, in Sydney’s eastern suburbs, is adding HOYA Ondol hydronic floor heating to the kitchen and dining area on the first floor. The builder is FKR Constructions, and Blue Planet Plumbing of St Ives laid the panels and pipe.

A concrete screed wasn’t suitable on this first floor: it would have added too much weight and too much height to the timber floor. Instead, reflective foil went down over the existing timber subfloor and HOYA Ondol dry panels were laid straight on top. The 16 mm PE-RT pipe sits in the channels moulded into the panels, so nothing was poured.

Project at a glance

LocationQueens Park NSW 2022
StatusProject in progress
Type of jobRenovation, first floor
Area heatedKitchen and dining area
Laid overFirst-floor timber subfloor
PanelsHOYA Ondol dry panels
Pipe16 mm PE-RT
Floor finishPlywood overlay with solid timber glued down
Heat sourceSupplied by others
BuilderFKR Constructions (opens in a new tab)
Hydronic plumberBlue Planet Plumbing & Heating (opens in a new tab)
St Ives NSW

Laying the panels

Reflective foil went down over the first-floor timber subfloor first, and the panels were laid straight on top of it. No screed was poured, which keeps both the weight and the added floor height down.

Reflective foil laid over a first-floor timber subfloor, with the first HOYA Ondol dry panels going down and a stack of panels ready to lay
Reflective foil over the first-floor timber subfloor, with the first panels going down.
Black HOYA Ondol dry panels laid edge to edge across the kitchen and dining area of a Sydney renovation
Panels laid across the kitchen and dining area.

Laying the pipe

White 16 mm PE-RT heating pipe pressed into the channels of HOYA Ondol panels in loops

Products used

  • HOYA Ondol dry panels laid on reflective foil over the first-floor timber subfloor
  • 16 mm PE-RT pipe pressed into the panel channels
  • Heat source supplied by others
  • Plywood overlay with solid timber glued down, as specified by the builder

The pipe runs in loops through the panel channels. Manifold and heat source connections must be made by a licensed plumber.

Photo: 16 mm PE-RT pipe pressed into the panel channels.

Heating pipe running in parallel loops through HOYA Ondol panels, turning at the edge of the room
Pipe laid in loops through the panel channels, turning at the edge of the room.
The kitchen and dining floor covered, with the pipe layout marked in red lines across the surface
The pipe layout marked in red across the kitchen and dining floor.

Project in progress. We will add photos of the finished solid timber floor when the work is complete.

Who is involved

Installation note: The panels can be laid by a builder, carpenter or flooring installer, following HOYA Ondol’s installation instructions and the panel and pipe layout designed for your floor, working with your hydronic installer. Manifold, heat pump or boiler connections must be made by a licensed plumber, and electrical work by a licensed electrician. In some states, laying the heating pipe itself is also licensed plumbing work, so check with your installer. Warranty requires licensed connections. This does not limit your rights under the Australian Consumer Law. Read the warranty conditions.

Where to next

HOYA Ondol B-Panel, a 500 by 500 mm dry hydronic heating panel with straight and curved channels, shown with its cover panel lifted above it

HOYA Ondol panels

A, B and C panels for timber, tile and renovation floors.

Timber frame of a new two-storey house under construction

Send us your plans

A heating layout and quote prepared from your house plans.

Illustration of two miniature installer figures in orange high-visibility vests standing on a black HOYA Ondol floor heating panel, one checking a tablet and one pointing at the white heating pipe in its channel

Support

Installation guides, panel specifications and videos.

Renovated room with newly finished timber floorboards and a floor vent

Register your warranty

Record your installation and the licensed trades who did it.