Hydronic heating
Heating that moves warm water through pipes. In floor heating, the pipes sit under the floor and the whole floor gently warms the room. Our hydronic heating guide explains how it works.
Plain-English meanings for the words you will hear when planning hydronic floor heating. Where a term needs more detail, we link to the page that explains it.
Heating that moves warm water through pipes. In floor heating, the pipes sit under the floor and the whole floor gently warms the room. Our hydronic heating guide explains how it works.
Pipes are tied to the reinforcing mesh and cast into a new concrete slab. It suits new builds, and the slab is slow to warm up and cool down.
Pipes are laid on the slab and covered with a sand and cement screed, often 70–110 mm thick. The screed needs drying time before flooring goes down.
Pipes clip into grooved panels laid over the floor, with no wet screed. HOYA Ondol panels are a dry-panel system.
Adding floor heating to an existing home, usually over the current floor while you renovate. See retrofit hydronic floor heating.
Heating cables or mats under the floor that run directly on electricity. It is a different system from hydronic heating, which heats water.
The unit that sends warm water to each pipe circuit and takes it back. It usually sits in a cupboard or wall cavity. See pipe and manifolds.
Polyethylene of raised temperature resistance: a flexible pipe made for heating water. HOYA Ondol uses 16 mm PE-RT pipe at 169 mm spacing.
One continuous run of pipe from the manifold and back. Each of our circuits is about 90–95 m long and heats roughly 15–16 m².
The appliance that heats the water, such as an air-to-water heat pump or a boiler. See heat pumps.
A heat pump that takes heat from the outside air and moves it into the heating water. Electricity runs the compressor and fans.
A small tank of heated water between the heat source and the manifold. Some systems use one to help the heat pump run in longer, steadier cycles.
A zone is an area run by its own thermostat, so rooms you use less can be kept cooler.
A floor heating system made to add as little height as possible, using thin panels instead of a thick screed. HOYA Ondol panels add 27.7 mm before the floor finish.
A thin layer laid under the panels. In the HOYA Ondol build-up it is 1.7 mm thick, under a 26 mm panel.
A 6 mm board laid over the panels before tiling, so tiles have a firm, flat base.
A foam strip around the edge of a room that leaves space for the floor to move as it warms and cools. It is used where needed.
All the layers from the existing floor to the finished surface. With 14.2 mm engineered timber on our panels, the finished floor sits 41.9 mm above the old one. See floor heating heights.
The structural floor under the finished floor: a concrete slab, or timber boards or sheets on joists.
How much heat a floor stores. A thick slab stores a lot, so it is slow to heat and cool. A thin panel floor stores less and responds sooner.
How long a cold floor takes to reach its working temperature. It depends on the floor build-up, the floor finish and the heat source.
The cold outdoor temperature a heating system is sized for in your area. The heat loss on that day sets the size of the heat source.
Flow is the warm water going out to the floor. Return is the cooler water coming back to the heat source to be reheated.
Setting each circuit at the manifold so every room gets its share of warm water. It is part of commissioning.
Filling the pipe and holding it under pressure to prove there are no leaks before the floor finish goes down.
The pump that moves water through the heating circuits.
A valve that blends hot water with returning water to hold the flow temperature at a set level. It is used where the heat source runs hotter than the floor needs.
A small tank that takes up the extra volume as the heating water warms and expands, so system pressure stays steady.
A wall control that senses the room temperature and turns that zone on or off.
A valve, often a small actuator on the manifold, that opens or closes a room’s circuits when its thermostat calls for heat. See pipe and manifolds.
Seasonal coefficient of performance: the average COP over a whole heating season, not at one test point. It is a better guide to running costs than a single COP rating.
Propane used as the refrigerant in some heat pumps. It has a very low global warming potential. Refrigerant work is done by licensed technicians.
In cold, damp weather, ice can form on the outdoor coil of a heat pump. The unit briefly reverses or pauses to melt it, then carries on heating. See heat pumps.
The total thickness the heating adds to the floor before the floor finish goes on. Ours is 27.7 mm: 1.7 mm foil plus a 26 mm panel. See floor heating heights.
The temperature of the water leaving the heat source. Under engineered timber we design around 35–45 °C.
How warm the floor is underfoot. Under engineered timber we keep it at or below 27 °C. See timber flooring over underfloor heating.
Coefficient of performance: the heat a heat pump delivers for each unit of electricity it uses. A COP of 3 means about 3 kWh of heat for 1 kWh of electricity. It changes with outdoor and water temperatures.
How fast a room loses heat through its walls, windows, floor and roof. It sets how much heat the system must supply, and it drives what floor heating costs.
Filling, pressure testing, balancing and first start-up of the system. It is done by a licensed tradesperson before the heating is used normally.
Manifold, heat pump and boiler connections must be made by a licensed plumber, and electrical work by a licensed electrician. In some states, laying the heating pipe is also licensed plumbing work. Warranty requires licensed connections.
The national law that gives you consumer guarantees on goods and services. Our warranty sits alongside these rights and does not limit them.
Send us your plans and tell us about the floor. We’ll explain the options in plain English and design the layout for your home.
The panels can be laid by a builder, carpenter or flooring installer, following HOYA Ondol’s installation instructions and the panel and pipe layout designed for your floor, working with your hydronic installer. Manifold, heat pump or boiler connections must be made by a licensed plumber, and electrical work by a licensed electrician. In some states, laying the heating pipe itself is also licensed plumbing work, so check with your installer. Warranty requires licensed connections. This does not limit your rights under the Australian Consumer Law.