REHVA Journal · 2018 · Simulation
Comparative performance analysis of floor heating systems
What it tested: Gritzki, Naumann and Kandzia modelled a 9 m² test room with a standard 65 mm wet screed and three thinner renovation systems, including a dry system, all starting from cold with 35 °C water.
What it found: The thin dry system reached the target floor temperature three times faster than the 65 mm screed. Under a timber parquet floor every system was slower and the differences were smaller.
What it means for HOYA Ondol: Supports the point that a floor with less mass warms up sooner. It did not test HOYA Ondol panels.